Rail bridge Installations
Delivering rail infrastructure safely and efficiently
For many of our clients, the biggest challenge is time. Respecting multiple stakeholder schedules and keeping disruption to a minimum. In Dumbarton, we only had 48 hours to replace a railway bridge.
Our experience with critical infrastructure makes it easy to handle these scenarios. We move heavy assets regularly to and from off-site holding areas – but we also know there are other ways to reduce the impact of these swap-outs.
With a detailed route analysis in place, we provided a fully-engineered report showing our approach for both assets, old and new:
- Removing the old bridge with hydraulic supports
- Transporting the old bridge 1km to an off-site compound with an SPMT
- Enabling first fix works on the new bridge at ground level, prior to installation
- Using an SPMT to transport and install the new bridge with our jacking system.
With our team providing fully-engineered calculations for increases in weight, this approach removed all the usual risks associated with working at height – saving a great deal of time and money for our client.
Delivering
“We always ask, 'can we find a better way to do this?' Common sense approaches often deliver the most efficient, cost-effective outcomes for our clients…”Neil Jones – Commercial Director, Osprey
Recent Projects
When you need experience, equipment, and enthusiasm…
Talk to Osprey. We’re one of the UK’s foremost large-scale logistics, heavy transport, and abnormal load specialists.
Offshore, onshore, on hand and on board to help you deliver your project.